THE WAR YEARS  
A particular service, which has been frequently acknowledged by the Soviet authorities, was the manufacture of power plant worth millions of pounds for Russia. M-V was main contractor for the complete equipment of seventeen land power stations. In addition thirty-five completely mobile power stations were constructed and shipped (through the Ministry of Supply) from the end of 1943; these ranged in size from 1000 to 5000 kW and consisted of trains of three or four trucks, one carrying the boiler and another the generating plant. Ten 500-kW generating units were made in a transportable form consisting of a self-contained turbogenerator set mounted in a framework with skids. A 30,000-kVA synchronous condenser was the largest that had been built in this country.

Marine propulsion equipment manufactured during and after the war included many geared turbines. Several 6800-s.hp units installed in cargo liners and fast tankers gave excellent performance in service, and their fuel consumption cornpared very favourably with that of reaction turbines built to meet the same operating conditions. Earlier a number of4000-s.hp turbines had been built for high speed gunboats; the weight of these turbines with gears and condenser was only a fraction over 4 Ib per s.hp, a figure that was characterized by the Admiralty as "a remarkable achievement". Following the manufacture of a prototype for use in a fast minelayer, fourteen welded l.p. cylinders—the largest ever made in this way—were constructed for propulsion turbines in aircraft carriers.

In 1938 when the Government decided that a national emergency pool of transportable transformers should be available in case of war, the Company took a prominent part in standardizing the range. It also built six 30,000-kVA 132/33-kV units, which were suitable for normal rail transport when fully assembled. Special transformers were made for radar, remote power control for guns, arc welding in shipbuilding, resistance welding in aircraft construction, and other purposes; oil-filled transformers for use in aircraft were hermetically sealed and provided with expansible enclosure to enable them to withstand the wide range of temperatures.

Centralized control systems were applied to air-raid precaution signals, and some fifteen equipments were installed by various supply undertakings. Among these was Manchester Corporation, where the Ripplay installation controlled the public sirens for a radius of more than 10 miles from the centre of the city, the largest single ripple-signal equipment in the world.