periods from six to ten years during which these machines and the
associated engine room equipment had been in service the average machine
load factor was 92.6 per cent and the average overall availability
factor 94.8 per cent.
The
Company is now planning for an annual output of a million kilowatts
of generating plant, more than three times the average for the last
twenty years.
GENERATORS
The design of turbo-generators has made steady progress. Today the
efficiency of the largest machines made by the Company is 98.5 per
cent, and the weight per kVA 4.5 lb, compared with 93 per cent and
12.5 Ib in 1914. The present year saw a great advance in British
practice when a 75,000-kVA generator was put into service at Littlebrook.
This was the first main generator to employ hydrogen cooling and
the first 3000-r.p.m. machine of its size in this country; its testing
in the works at full kVA rating was one of the largest wattless
load tests ever carried out. The stator, which weighed 128 tons,
presented a difficult problem to the works traffic department as
it had to be taken by road for a total distance of 280 miles. Six
similar machines and one of 66,600 kVA, all hydrogen cooled, are
now in hand.
Separately
driven exciters, which are sometimes preferred, have been provided
with flywheels to maintain full load excitation for a few seconds
if the supply should fail; in some sets the motor is transferred
automatically to another source of current, or the exciter has two
motors, each connected to a different supply.
Waterwheel
generators made for Karapiro (New Zealand) are the largest in output
and those for Tainionkoski (Finland) are the largest in diameter
of any built in Great Britain. The Karapiro machines, three of 33,333
kVA at 167 r.p.m., were installed in 1948. Each had a rotor weighing
180 tons complete, and the largest piece weighing 148 tons was the
biggest lift ever taken by the works cranes; the Company also designed
the thrust bearing, which is 7 feet in diameter and has to carry
a load of 750 tons. At Tainionkoski three 18,000-kVA 75-r.p.m. generators
will have been installed by the end of this year.
Other
large electrical machines in hand include the twenty-first 20,000-kVA
synchronous condenser for the Victoria Falls Company's system and
a 40,000-kVA unit for Australia; six of 30,000 kVA are being supplied
for Spain, and another has been sent to Russia. These are believed
to be the only 1000-r.p.m. condensers of their size. A frequency
changer of 31,250 kVA was recently supplied for the interconnection
of the 40-c/s and 50-c/s systems in Western Australia.
In
Diesel-electric ship propulsion a striking advance was the use of
a single set of Diesel-generators to supply all the power requirements
of the ship. This was done for the first time on three dredgers
recently put into service on the Mersey; the equipment is based
on a metadyne-controlled constant current circuit, into which each
of the main motors and deck machinery motors can be inserted in
series.
|